New Custom Boiler Installations

For all radiant panel and boiler contract installations, we include the following:
  • Calculations and design of the heating system
  • Labor and Materials to construct the system
  • Supervision of the construction and installation
  • Follow-up Service
  • Guarantees as to defects in materials and workmanship

SUPER SAVINGS ON NEW BOILER INSTALLATIONS!!
E-MAIL US FOR CURRENT PRICES.
HERE'S AN EXAMPLE OF THE INSTALLATION OF A TELEDYNE LAARS
JVH160 HYDRONIC BOILER PACKAGE.

THE STANDARD PACKAGE INCLUDES THE FOLLOWING:
  • 75,000-225,000 BTU boiler with electronic spark or hot surface ignition
  • B&G; 12 PSI pressure reducing valve
  • B&G; 30 PSI pressure relief valve
  • Extrol #15 air expansion tank
  • Weiss pressure/temperature gauge
  • Weiss 30 psi gauge for system pressure monitoring
  • low pressure cut off switch
  • high and low temperature controls
  • Low voltage combination gas valve/electronic ignition
  • Relay-transformer
  • (2)automatic air vents
  • (1) Grundfos UP26-64F pump
  • High pressure valving for purging/testing/service on all supply and returns – and needed safety and support equipment
  • We will install a new 4-6 inch flue venting system through the roof
  • Provide a combustible base if required
  • We will install a 24V Autosetback digital thermostat
  • All boiler plumbing will be in copper with wrought copper fittings and 95-5 or 50-50 soldered joints. (Pipe, parts, fittings, unions, electrical, ties hose bibbs, caps, miscellaneous)
  • We will remove the old boiler from the property and dispose of it
  • All boiler piping will be insulated with a 1/2” wall thermocel or equal
  • All valves will be labelled according to their function

We always valve the boiler for quick and easy pressure testing of the boiler, safety, support and radiant panel systems. We remove the old boiler from the property and install the boiler on a stand if required by local building codes. We always include a City Permit and require all installations be inspected and approved by the local governing agency.

As part of our service, we agree to inspect the installation prior to each heating season for (3) THREE years after the completion of the installation. Of course, there is never a charge for this additional service.

NOTE: The above components are provided as a sample listing of a common boiler package for the Eichler Home. Each boiler package is sized, customized and installed to the individual requirements of the home. The equipment can vary accordingly.

What about guarantees and equipment warranties?
We have always provided the best guarantees and warranties for our customers. These include the following:
  1. Three Year Warranty on System Components:
    We warrant the installation and each component and each part to be free from defects in materials and workmanship under normal use and service for (3) THREE years from the completion of the initial installation.
  2. Three Year Warranty on Installation:
    We warrant the installation of the system and each component and part to be free from defects under normal use and service for (3) THREE years from the completion of the installation.
  3. Twenty Five Year Warranty on Distribution Tubing for new tubing systems:
    We warrant the distribution tubing to be free from deterioration, electrolytic degradation, and leakage under normal use and service for (25) TWENTY FIVE years from the completion of the installation. When installed on the grade, extreme earth, slab and grade movement which cause the failure of a concealed tube is excluded from this warranty.
  4. Twenty Year Limited Warranty on all Boilers:
    The manufacturer provides this warranty.
  5. These guarantees and warranties apply to the original or any subsequent Owner of the property in which an ANDERSON RADIANT HEATING system has been installed.


Back to Main



ANDERSON RADIANT HEATING
520 East McGlincy Lane, Suite 16
Campbell, CA  95008
Phone: (408) 378-3868
Fax: (408) 559-0818

© Copyright 2012 - ANDERSON RADIANT HEATING
Privacy Policy